← Chicago Before the Fire · Year Explorer

Geography & accuracy · Research update

Putting 1871
in place.

The right streets, banks and shoreline are the foundation of the city. This audit shows where the map is tied to the ground, which readings changed, and what the measurements can—and cannot—tell us.

Scene date: , before the Great Fire. Audit dated . The city remains a reconstructed baseline; a better map fit does not identify every property.

Download the audit and all 36 controls ↓ · 1871 dossier · Primary-source field notebook

A correction to the first city baseline

Re-read the intersections.

The initial registration had picked the wrong printed line at several controls. The modern coordinate system was consistent; the historical map pixels needed correcting.

Ashland / Reuben

Four original picks lay 22–28.5 pixels west of the intended street centre, in a neighboring street or block. The street opening was read again between its two printed edges.

Halsted and Thirty-first

Four Halsted picks lay 6.5–10 pixels west, with street-edge and rail-line confusion. At State and Thirty-first, the original pick followed the nearby border rather than the roadway centre.

Reject a misleading corner

Western at Fullerton has a modern crossing, but the map’s ornamental frame obscures the street opening. It is excluded instead of assigning a precise-looking map pixel.

Fourteen original control locations were re-read, and 22 additional intersections were accepted. Of the resulting 36, 28 determine the fitted map. Eight spatially distributed intersections were set aside before model selection and remain independent checks; they do not pull the published map into position.

Controls used to fit
28

Street intersections read on the actual scan

Independent checks
8

Excluded from fitting and model selection

Check RMS error
15.62 m

Previously 49.97 m at these same eight locations

Largest check error
25.65 m

A measured result, not a citywide maximum

RMS is the square root of the mean squared horizontal error. It describes these measurements; it is neither a guaranteed distance nor a confidence interval for every point in Chicago.

Read the source and the test together

The 1870 map, with its controls.

Blue circles are the 28 fitted controls. Rust squares are the eight reserved checks. The numbers match the table below. Enlarge the original scan and scroll to inspect individual street openings; selecting a marker takes you to its recorded residual.

Fit · 28 circlesIndependent check · 8 squares
Mitchell’s Chicago map of 1870 with 36 registration controlsAn unaltered source raster with a separate overlay of fitted controls and independent checks. The adjacent table supplies every point’s name and error. 11. State Street x Madison Street; fit point; residual 22.57 metres 22. State Street x Cermak Road (Twenty-Second Street); fit point; residual 11.81 metres 33. State Street x Roosevelt Road (Twelfth Street); fit point; residual 20.06 metres 44. State Street x Thirty-First Street; fit point; residual 39.63 metres 55. Halsted Street x Madison Street; fit point; residual 7.81 metres 66. Halsted Street x Cermak Road (Twenty-Second Street); fit point; residual 14.51 metres 77. Halsted Street x Roosevelt Road (Twelfth Street); fit point; residual 24.86 metres 88. Halsted Street x North Avenue; fit point; residual 12.99 metres 99. Western Avenue x Madison Street; fit point; residual 15.32 metres 1010. Western Avenue x Roosevelt Road (Twelfth Street); fit point; residual 36.97 metres 1111. Ashland Avenue x Chicago Avenue; fit point; residual 7.64 metres 1212. Ashland Avenue x Madison Street; fit point; residual 11.69 metres 1313. Ashland Avenue x Roosevelt Road (Twelfth Street); fit point; residual 30.33 metres 1414. Ashland Avenue x North Avenue; fit point; residual 4.32 metres 1515. Ashland Avenue x Fullerton Avenue; check point; residual 12.10 metres 1616. Halsted Street x Fullerton Avenue; fit point; residual 8.17 metres 1717. Western Avenue x North Avenue; check point; residual 9.69 metres 1818. Western Avenue x Division Street; fit point; residual 9.72 metres 1919. Ashland Avenue x Division Street; fit point; residual 6.81 metres 2020. Halsted Street x Division Street; check point; residual 14.65 metres 2121. Western Avenue x Chicago Avenue; fit point; residual 12.57 metres 2222. State Street x Chicago Avenue; check point; residual 22.80 metres 2323. Ashland Avenue x 16th Street; check point; residual 25.65 metres 2424. Halsted Street x 16th Street; fit point; residual 17.16 metres 2525. State Street x 16th Street; fit point; residual 19.47 metres 2626. Halsted Street x 31st Street; fit point; residual 25.21 metres 2727. Western Avenue x Cermak Road; check point; residual 15.73 metres 2828. Ashland Avenue x Cermak Road; fit point; residual 31.03 metres 2929. LaSalle Street x Lake Street; check point; residual 2.95 metres 3030. LaSalle Street x Randolph Street; fit point; residual 8.12 metres 3131. LaSalle Street x Washington Street; fit point; residual 10.62 metres 3232. LaSalle Street x Madison Street; fit point; residual 7.90 metres 3333. Clark Street x Madison Street; check point; residual 7.92 metres 3434. Wells Street x Madison Street; fit point; residual 13.20 metres 3535. Clark Street x Lake Street; fit point; residual 6.82 metres 3636. Wells Street x Randolph Street; fit point; residual 15.63 metres
S. Augustus Mitchell, Chicago, 1870, approximately 1:31,000. Public-domain scan, University of Illinois Map and Geography Library via Wikimedia Commons. The overlay is this project’s measurement record, not part of the historic map. Source and rights · Open the original scan.

Inspect the retained water, park and crossing readings on the original map → This full-resolution overlay shows source-pixel centrelines, shoreline and lagoon edges, park outlines and 22 crossing points: 21 report-tabulated bridges plus the separately map-attested Division canal crossing. River widths and outer extensions without retained pixels are omitted; these generalized readings are not surveyed banks.

All 36 controls and their measured residuals
Errors against the affine transform fitted only to the 28 fit controls. Check rows remain independent.
Map no.IntersectionRoleResidual
1State Street x Madison StreetFit22.57 m
2State Street x Cermak Road (Twenty-Second Street)Fit11.81 m
3State Street x Roosevelt Road (Twelfth Street)Fit20.06 m
4State Street x Thirty-First StreetFit39.63 m
5Halsted Street x Madison StreetFit7.81 m
6Halsted Street x Cermak Road (Twenty-Second Street)Fit14.51 m
7Halsted Street x Roosevelt Road (Twelfth Street)Fit24.86 m
8Halsted Street x North AvenueFit12.99 m
9Western Avenue x Madison StreetFit15.32 m
10Western Avenue x Roosevelt Road (Twelfth Street)Fit36.97 m
11Ashland Avenue x Chicago AvenueFit7.64 m
12Ashland Avenue x Madison StreetFit11.69 m
13Ashland Avenue x Roosevelt Road (Twelfth Street)Fit30.33 m
14Ashland Avenue x North AvenueFit4.32 m
15Ashland Avenue x Fullerton AvenueCheck12.10 m
16Halsted Street x Fullerton AvenueFit8.17 m
17Western Avenue x North AvenueCheck9.69 m
18Western Avenue x Division StreetFit9.72 m
19Ashland Avenue x Division StreetFit6.81 m
20Halsted Street x Division StreetCheck14.65 m
21Western Avenue x Chicago AvenueFit12.57 m
22State Street x Chicago AvenueCheck22.80 m
23Ashland Avenue x 16th StreetCheck25.65 m
24Halsted Street x 16th StreetFit17.16 m
25State Street x 16th StreetFit19.47 m
26Halsted Street x 31st StreetFit25.21 m
27Western Avenue x Cermak RoadCheck15.73 m
28Ashland Avenue x Cermak RoadFit31.03 m
29LaSalle Street x Lake StreetCheck2.95 m
30LaSalle Street x Randolph StreetFit8.12 m
31LaSalle Street x Washington StreetFit10.62 m
32LaSalle Street x Madison StreetFit7.90 m
33Clark Street x Madison StreetCheck7.92 m
34Wells Street x Madison StreetFit13.20 m
35Clark Street x Lake StreetFit6.82 m
36Wells Street x Randolph StreetFit15.63 m

Modern road controls are candidates for historical continuity, not proof that every centreline remained fixed. The original fourteen retain their recorded averaging provenance. New OSM targets retain actual shared roadway node IDs and exclude cycleways, service roads, tunnels and proposed or construction geometry.

Different questions need different error measures

Fit is not historical accuracy.

What each number measures, and where it stops
MeasureResultMeaning
Fit residual, 28 controls18.67 m RMSAgreement at the points used to calculate the transform. This is in-sample fit.
Reserved checks, 8 controls15.62 m RMS
25.65 m maximum
Independent performance at eight identified intersections. They were not used to select or fit the shipped model.
Leave-one-out development check21.49 m RMSEach development point is predicted from the other 27. Useful sensitivity testing, distinct from the eight untouched checks.
Registration allowanceAbout 30 mA working allowance for locating broad mapped features. It is not a statistical confidence interval or a guaranteed upper bound.
Generalized map lines and banks40–80 mA provisional working allowance for engraving, line selection and generalized geometry, separate from registration. Not a measured confidence interval.
Outskirts beyond the map150–300 m
or greater
A working allowance for reconstructed continuations beyond the sheet. Independent historical control is still needed there.
Heights, lake stage and bank profileNo accuracy inferredHorizontal map registration supplies no street elevation, bridge-deck level, water stage or underwater bank slope.

The chosen transform is affine: one consistent translation, rotation, scale and shear across the sheet. Projective, quadratic and thin-plate-spline alternatives were compared using geographically withheld districts within the development set. Extra flexibility improved some training fits but behaved worse when predicting a district left out of fitting. The eight final checks were kept out of that choice.

These error components are not simply added into a single “accuracy” number. A well-registered printed riverbank can still show the wrong date, a generalized quay edge or a waterline at another lake level.

Coordinate system and reproducibility

Modern targets are projected to NAD83 / UTM zone 16N (EPSG:26916), in metres. The local scene subtracts easting 447072.7 and northing 4637395.8. The 3D export uses east as x, north as −z and height as y.

All fourteen original control coordinates reproduce from their stored latitude and longitude within 0.0055 m of rounding. This rules out an origin or axis mismatch in those recorded targets; it does not certify their historical alignment or OSM survey accuracy. Only modern target coordinates were reused from earlier work, not the 1849 map’s pixels, transform or banks.

At State and Madison, the earlier record’s four pairwise road intersections reduce to one distinct shared OSM node at the same coordinate. Counts of way-pair crossings must not be mistaken for counts of independent observations. Cermak’s earlier averaging remains a separate limitation.

More detailed evidence, with a different date

A closer look at the harbor.

A federal engineering sheet has now been acquired and read: Chicago Harbor in August 1869, at one inch to 300 feet (1:3,600). That is about 8.6 times the linear map scale of Mitchell’s city map. It offers much finer drawn detail at the river mouth; scale alone does not establish ground accuracy.

August 1869 engineering map showing the Chicago River mouth, dock basins, north and south piers, depth soundings and land being filled.
Federal harbor sheet, August 1869. The image says “No. 39”; the catalog record and file name say October 1868 / Sheet 38. Both are retained in the research record. Public domain, National Archives via DPLA/Wikimedia Commons. National Archives record.

What the sheet shows

River-mouth banks, the north dock basin, the lighthouse enclosure, Illinois Central slips and buildings, soundings, a south pier labeled “built in 1869,” and ground explicitly described as being filled.

What changed after 1869

Later cribwork is documented: 29 breakwater cribs were placed in 1870 and spring 1871. Their exact alignment and above-water completion still need reconciliation. Fill, docks and dredging also changed the harbor after the survey.

What remains unregistered

Eight bank, shore and pier traces are now recorded in image space and relative metres from the printed scale. Absolute alignment remains pending: historical street controls and independent checks are still required before they define an 1871 shoreline.

The fill enclosure is not the dry shoreline. The Illinois Central outer enclosure and the irregular interior waterline are traced as separate features. The sheet says filling was in progress, so treating the whole enclosed area as finished dry land would erase the distinction the source draws.

The February 1870 federal report describes a July–August 1869 harbor survey and a larger tracing at 400 feet to the inch. It also distinguishes proposed outer-harbor works. The March 1871 contract return records 800 feet of breakwater, stone-filled timber cribs and dredging under contract, with a November 1871 expiration. A later progress report supplies evidence of actual construction.

Pre-fire cribwork is documented. The Report of the Chief of Engineers, 1871, printed pages 35 and 117, records 23 cribs placed in 1870 and six more in spring 1871: 29 cribs totaling 1,450 feet, including a 300-foot westward return. The report is dated 20 October 1871, after the fire, but its fiscal-year account ends 30 June and explicitly places this work in 1870 and spring 1871. This supports the earlier cribwork; it does not date every later progress statement to the scene.

The above-water superstructure remains less certain. The summary mentions about 200 feet; Appendix A16 reports 1,000 feet of six-foot-high superstructure “at the writing of this report.” Those reporting states need reconciliation before assigning an exact completed length on 8 October. A further 900-foot extension and completion by June 1872 are projections, and are excluded from the pre-fire completed-work claim. The documentary lengths also do not locate the breakwater in the city coordinate system.

A 1865 harbor survey and a 1872 U.S. Lake Survey map provide additional comparisons. The latter was published after the fire, and its inspected title does not establish when each feature was surveyed. Its sounding reference is a historical Milwaukee grade plane, not automatically the simulation’s water-level datum.

Dates, provenance and useful limits

The geography source shelf.

Three harbor/city survey sheets were visually inspected in this pass, and three federal reports were read in part. A catalog entry, an acquired image, a registered map and an accepted 1871 terrain feature are separate stages of evidence.

1870

Chicago — S. Augustus Mitchell, 1870

City grid, river branches, railway corridors and broad shoreline. Approximately 1:31,000; a reference map, not a parcel survey.

Public domain; University of Illinois Map and Geography Library, via Wikimedia Commons.

1869-08 as printed on the sheet

Chicago Harbor in August 1869 — U.S. Harbor Improvements

Local river-mouth engineering detail, docks, piers, soundings and fill in progress. 1 inch to 300 feet (1:3,600). Registration and October 1871 completion checks remain separate work.

Date discrepancy: NARA catalog/filename says October 1868 / Sheet 38; actual image says August 1869 and manuscript No.39. The image date is retained without concealing the catalog discrepancy.

Public domain federal government work; NARA/DPLA/Wikimedia Commons.

Published 1872; underlying survey dates not established by the inspected title

Map of the City of Chicago — U.S. Lake Survey, 1872

Post-fire comparison with a stated trigonometrical/local-survey basis. Survey epoch and historical datum must be reconciled before pre-fire use.

Public domain; NOAA Office of Coast Survey Historical Map & Chart Collection. Not for navigation.

1870-02-07

Improvement of the Chicago Harbor — 7 February 1870

Printed pp.1–6 inspected. Page 2 describes a July–August 1869 survey and tracing W at 400 feet/inch; page 4 distinguishes proposed outer-harbor works. Referenced large tracing not included in the downloaded eight-page report.

Public domain United States Government publication.

1871-03-15

Army Engineer Contracts — 15 March 1871

Printed p.3 records the 1870 Fox & Howard contract for 800 feet of Chicago breakwater, stone-filled timber cribs and dredging, expiring 30 November 1871. A contract is not a completion measurement for 8 October.

Public domain United States Government publication.

Main report dated 20 October 1871; Houston appendix covers the year ending 30 June 1871

Report of the Chief of Engineers, 1871 — Chicago Harbor

Printed pp. 35 and 117 document 23 cribs placed in 1870 and six in spring 1871: 29 cribs / 1,450 feet, including a 300-foot west return. The compiled report is post-fire; these earlier works are explicitly dated. The 200-foot versus 1,000-foot superstructure reports remain unresolved for 8 October. A projected 900-foot extension is not counted as completed work.

Public domain federal government publication; USACE Digital Library.

1869-04-09

A New Map of Chicago — Chicago Evening Post, 9 April 1869

Municipal extent and ward context. Newspaper graphic date and the modern page title are kept distinct; the historic graphic, rather than a modern summary table, supplies the boundary reading.

Original 1869 newspaper graphic public domain; modern host text is not copied as an asset.

Municipal year ending 31 March 1871

Chicago Board of Public Works — Tenth Annual Report, 1871

Street, sidewalk, sewer and bridge work with reporting dates. It does not cover every change through 8 October 1871. See the field notebook for individual pages.

Public domain original municipal report and faithful scan.

From a city baseline to specific places

What the next survey must establish.

  1. Register the detailed harbor sources

    Use identifiable surviving street or right-of-way controls, with widening and renamed streets adjudicated individually. Reserve independent checks across the sheet, rather than relying on a line of nearly collinear points.

  2. Reconcile the construction date

    Reconcile the progress reports already found with pay estimates and dated views for fill, breakwater superstructure and later extensions. Preserve “proposed,” “under contract,” “in progress” and “completed” as different states.

  3. Replace generalized banks locally

    Compare survey edges with Mitchell’s broad city geography and the date-qualified shoreline history. Trace the quay, natural bank and waterline as different features where the evidence separates them.

  4. Measure the vertical city

    Locate street-grade profiles, bridge-deck levels and water-stage references; establish datum conversions before using soundings or historical elevations. A smooth rendered terrain is still a reconstruction.

  5. Seat researched properties and activity

    Use dated parcel plans, measured footprints, photographs and directory evidence to replace generic context lots. Registration alone does not tell us a business’s facade, a household’s location or an action at a particular hour.

The 8 October cutoff also requires earlier damage to be reconciled, including the Saturday Night Fire. A record listed in 1871 is not automatically standing and occupied at the scene’s exact hour. The field notebook keeps people, materials and actions tied to their own source dates.

Open the underlying measurement records

The linked repository files are the active research records. This page’s dated audit download keeps the measurements and control positions used for this edition.